Quote:
|
Originally Posted by Zero Signal
Just for whoever may want to use it! I tried it on Derek78's PMASS 80mm with good success. It will calculate the 30 point curve within +/- .1% accuracy.
I made it since CalEdit doesn't calculate it right, go figure.
Let me know if the link doesn't work.
http://www.byteblock.com/MAF%2010-30...Conversion.xls
|
Hey John
Thats great
I know it will help a lot of members
I had heard something about CalEdit having some kind of issue but figured that had been corrected in V1.30
I've always used an old program called EEC Editor so I was not sure.
Grady